CityCA
Posted
Sep 29, 2026
Oct 12, 2026
Camino Colegio Sewer Manhole Interconnect Project
Work includes 2 EA remove and replace sewer manhole grade rings, frame and cover; 33 LF concrete curb and gutter; 30 LF install sanitary sewer main with PVC pipe by open cut construction; 1 LS restore street median landscaping and irrigation to pre-existing conditions; 1 EA install drop manhole per city standard 503.
