Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consisting of adding a new influent pump and variable frequency drive to the existing influent pump station and associated piping and electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Premium
Access the largest public sector contact database
Rehabilitation of the Wastewater Treatment Plant (WWTP) Influent Pump Station, including wet well coating, piping, controls, manhole replacement, electrical upgrades, and odor control system replacement.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Rehabilitation of the Wastewater Treatment Plant (WWTP) Influent Pump Station, including wet well coating, piping, controls, manhole replacement, electrical upgrades, and odor control system replacement.
AvailableWork includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
AvailableProvide Influent Pump Station Expansion Project CM/GC. Construction Manager / General Contractor (“CM/GC”) delivery method to integrate design and construction planning, improve risk management, and maintain operational continuity during construction. The CM/GC will first perform pre-construction services, then, upon agreement of a Guaranteed Maximum Price (“GMP”), may proceed to construction under a contract amendment.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Close: Jan 29, 2026
Provide Influent Pump Station Expansion Project CM/GC. Construction Manager / General Contractor (“CM/GC”) delivery method to integrate design and construction planning, improve risk management, and maintain operational continuity during construction. The CM/GC will first perform pre-construction services, then, upon agreement of a Guaranteed Maximum Price (“GMP”), may proceed to construction under a contract amendment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis