Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of the Wastewater Treatment Plant (WWTP) Influent Pump Station, including wet well coating, piping, controls, manhole replacement, electrical upgrades, and odor control system replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Premium
Access the largest public sector contact database
Subcontract bids for the following trades. Work may include, but not limited to: wastewater treatment plant, submersible non-clog sewage pump, magnetic flow meters, electrical, concrete work, gravel, hauling, turf, temporary bypass pumping, temporary environmental controls, seeding and restoration, erosion control, demolition, coating and painting, quality control, material testing, influent pump control panel, rock excavation or blasting and removal, videotaping, material testing, temporary utilities, dewatering, compaction of trenches, and backfill along with any incidentals and materials necessary for construction to complete the project.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Close: Dec 11, 2025
Subcontract bids for the following trades. Work may include, but not limited to: wastewater treatment plant, submersible non-clog sewage pump, magnetic flow meters, electrical, concrete work, gravel, hauling, turf, temporary bypass pumping, temporary environmental controls, seeding and restoration, erosion control, demolition, coating and painting, quality control, material testing, influent pump control panel, rock excavation or blasting and removal, videotaping, material testing, temporary utilities, dewatering, compaction of trenches, and backfill along with any incidentals and materials necessary for construction to complete the project.
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Posted Date
Nov 3, 2025
Due Date
Dec 11, 2025
Release: Nov 3, 2025
Close: Dec 11, 2025
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Work includes rehabilitation of existing master pump station.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
Work includes rehabilitation of existing master pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis