Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Butler County, Pennsylvania is soliciting sealed bids via the PennBid portal for the Butler Township Storm Water Project. Bids are due January 26, 2026 at 9:00 AM EST, with a mandatory pre-bid meeting on January 7, 2026 at Gateway Engineers in Butler, PA. The work entails stormwater improvements in Butler Township as described in the bid package and associated documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project involves a storm sewer replacement. Project to include the removal of existing storm pipe, manholes, inlets, and trees. Installation of the following: SLCPP pipe, 48” 72”, and 84” storm manholes, Type- 4 inlets, and Type-C inlets. Construction activities will include demolition, excavation and minor grading, installation of storm sewer system, lawn and driveway restoration.
Posted Date
Dec 13, 2025
Due Date
Jan 26, 2026
Release: Dec 13, 2025
Close: Jan 26, 2026
This project involves a storm sewer replacement. Project to include the removal of existing storm pipe, manholes, inlets, and trees. Installation of the following: SLCPP pipe, 48” 72”, and 84” storm manholes, Type- 4 inlets, and Type-C inlets. Construction activities will include demolition, excavation and minor grading, installation of storm sewer system, lawn and driveway restoration.
Premium
Access the largest public sector contact database
Work for the project includes lining existing storm sewer pipe. Approx. quantities are: 691 LF of 36" dia. cmp pipe, 444 LF of 24" dia. cmp pipe, 315 LF of 18" dia. cmp pipe, two new manholes. Lining shall be cured-in-place pipe (cipp) using a resin-impregnated fiberfelt tube. The work includes cleaning and video inspection of the sanitary sewer pipe before lining. Work shall include traffic control, restoration and all other incidental items and work described.
Posted Date
Dec 18, 2025
Due Date
Jan 8, 2026
Release: Dec 18, 2025
Close: Jan 8, 2026
Work for the project includes lining existing storm sewer pipe. Approx. quantities are: 691 LF of 36" dia. cmp pipe, 444 LF of 24" dia. cmp pipe, 315 LF of 18" dia. cmp pipe, two new manholes. Lining shall be cured-in-place pipe (cipp) using a resin-impregnated fiberfelt tube. The work includes cleaning and video inspection of the sanitary sewer pipe before lining. Work shall include traffic control, restoration and all other incidental items and work described.
AvailableImprove wastewater and storm water enhancement treatment applications.
Posted Date
Oct 13, 2025
Due Date
Jan 6, 2026
Release: Oct 13, 2025
Close: Jan 6, 2026
Improve wastewater and storm water enhancement treatment applications.
AvailableRelease: Dec 17, 2025
Close: Jan 12, 2026
Lining of storm drain.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis