Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes electric vehicle charging station installation project involving procurement and installation of EV chargers at City of Fairfield facilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide EV Chargers.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
Provide EV Chargers.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes approx. 365 LF of furnish and install Concrete Curb, 200 LF of furnish and Install Striping, 185 LF of 8" installed storm drain,1,400 LF of Furnish and Install Striping , 10 EA of furnish and install concrete wheel stops, 4 EA of Furnish and Install 135kip (4’x5’x4’D) underground pull boxes,1 LS of earthwork and site grading ,2 EA of furnish and install SD Manhole ,58 EA of furnish and install electrical vehicle chargers.
Posted Date
Oct 20, 2025
Due Date
Jan 20, 2026
Release: Oct 20, 2025
Close: Jan 20, 2026
Project includes approx. 365 LF of furnish and install Concrete Curb, 200 LF of furnish and Install Striping, 185 LF of 8" installed storm drain,1,400 LF of Furnish and Install Striping , 10 EA of furnish and install concrete wheel stops, 4 EA of Furnish and Install 135kip (4’x5’x4’D) underground pull boxes,1 LS of earthwork and site grading ,2 EA of furnish and install SD Manhole ,58 EA of furnish and install electrical vehicle chargers.
AvailableBid package 33: Transportation - South Lot: EV Charging - Phase 2. WC 28 - site electrical, consisting of distribution equipment, underground gas and electric infrastructure, equipment pads, bus chargers.
Posted Date
Jan 5, 2026
Due Date
Jan 20, 2026
Release: Jan 5, 2026
Close: Jan 20, 2026
Bid package 33: Transportation - South Lot: EV Charging - Phase 2. WC 28 - site electrical, consisting of distribution equipment, underground gas and electric infrastructure, equipment pads, bus chargers.
AvailableThe City of Santa Rosa is soliciting sealed bids (IFB 26-01) for installation and electrification of EV charging infrastructure in Parking Lot 10, including four dual-port Level II chargers and two single-port Level III fast chargers, plus necessary concrete/asphalt removal and replacement per engineered drawings. A mandatory onsite pre-bid meeting is scheduled and the procurement will be awarded as a lump-sum construction IFB; electronic responses are required. The solicitation is a standard public works procurement (not a grant) and is currently in the bidding stage.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
The City of Santa Rosa is soliciting sealed bids (IFB 26-01) for installation and electrification of EV charging infrastructure in Parking Lot 10, including four dual-port Level II chargers and two single-port Level III fast chargers, plus necessary concrete/asphalt removal and replacement per engineered drawings. A mandatory onsite pre-bid meeting is scheduled and the procurement will be awarded as a lump-sum construction IFB; electronic responses are required. The solicitation is a standard public works procurement (not a grant) and is currently in the bidding stage.