Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes approx. 365 LF of furnish and install Concrete Curb, 200 LF of furnish and Install Striping, 185 LF of 8" installed storm drain,1,400 LF of Furnish and Install Striping , 10 EA of furnish and install concrete wheel stops, 4 EA of Furnish and Install 135kip (4’x5’x4’D) underground pull boxes,1 LS of earthwork and site grading ,2 EA of furnish and install SD Manhole ,58 EA of furnish and install electrical vehicle chargers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide EV Chargers.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
Provide EV Chargers.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Power generation and microgrid.
Posted Date
Nov 27, 2025
Due Date
Jan 13, 2026
Release: Nov 27, 2025
Close: Jan 13, 2026
Power generation and microgrid.
AvailablePower generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
Posted Date
Sep 29, 2025
Due Date
Feb 18, 2026
Release: Sep 29, 2025
Close: Feb 18, 2026
Power generation microgrid; HEMP shielding improvements; uninterruptible power supplies systems with bypass; facility security improvements.
AvailableDESIGN-BUILD: Design-Bid-Build (D-B-B) construction of a microgrid system powered by two 7.5 MW combined heat and power (CHP) combustion turbines with dual-fuel capable natural gas and propane fuel systems that make a 15 MW CHP power/heat production plant. The CHP will include heat recovery steam generators (HRSGs) and supplemental exhaust duct firing along with a black start diesel generator. The project will include all electrical distribution equipment and underground duct bank needed to connect to the existing electrical infrastructure. Microgrid controls will be installed to manage various modes of operation to include parallel mode with existing utility, island mode, and black start mode. The microgrid control system will be state of the art and will be integrated with two existing substations at four points of common coupling for seamless operation and load shed capability with the ability to island during a utility grid outage and leverage load shedding to balance microgrid supply and demand during islanded operation, and resynchronization with the grid upon grid restoration. The project will include both electricity microgrid features and simultaneous heat production and steam distribution features. The project will also include installation of two 500-gallon waste water/oil underground storage tanks with double wall interstitial leak monitoring and overfill alarms. The project will involve installing all piping and equipment needed to connect the CHP to the installation’s existing natural gas, steam, condensate, and water infrastructure and operate in tandem with the installation’s existing central heating plant. The microgrid will have industrial grade controls with a new control room located in the central heating plant. Environmental controls will be through the use of low NOx turbines and duct burners. The project also includes site improvements, demolition, full air permitting, communications, and full commissioning.
Posted Date
Dec 18, 2025
Due Date
Jan 6, 2026
Release: Dec 18, 2025
Close: Jan 6, 2026
DESIGN-BUILD: Design-Bid-Build (D-B-B) construction of a microgrid system powered by two 7.5 MW combined heat and power (CHP) combustion turbines with dual-fuel capable natural gas and propane fuel systems that make a 15 MW CHP power/heat production plant. The CHP will include heat recovery steam generators (HRSGs) and supplemental exhaust duct firing along with a black start diesel generator. The project will include all electrical distribution equipment and underground duct bank needed to connect to the existing electrical infrastructure. Microgrid controls will be installed to manage various modes of operation to include parallel mode with existing utility, island mode, and black start mode. The microgrid control system will be state of the art and will be integrated with two existing substations at four points of common coupling for seamless operation and load shed capability with the ability to island during a utility grid outage and leverage load shedding to balance microgrid supply and demand during islanded operation, and resynchronization with the grid upon grid restoration. The project will include both electricity microgrid features and simultaneous heat production and steam distribution features. The project will also include installation of two 500-gallon waste water/oil underground storage tanks with double wall interstitial leak monitoring and overfill alarms. The project will involve installing all piping and equipment needed to connect the CHP to the installation’s existing natural gas, steam, condensate, and water infrastructure and operate in tandem with the installation’s existing central heating plant. The microgrid will have industrial grade controls with a new control room located in the central heating plant. Environmental controls will be through the use of low NOx turbines and duct burners. The project also includes site improvements, demolition, full air permitting, communications, and full commissioning.