Lewis County Public Utility District 1
Special DistrictWA
Posted
Oct 15, 2026
Nov 19, 2026
Description: The Lee County Electrical Cooperative seeks qualified contractors to repaint its Burnt Store Substation in North Fort Myers, including surface preparation, industrial-grade coating application, and finishing work. The project requires compliance with safety and environmental standards, and attendance at a mandatory pre-bid meeting at 4980 Bayline Drive, North Fort Myers, on October 5, 2026, at 10:00 AM. Proposals are due October 23, 2026, at 12:00 PM Eastern Time.
SpecialDistrict · FL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Lee County Electric Coop (LCEC).
Adjacent opportunities open for bidding right now.
Lewis County Public Utility District 1
Special DistrictWA
Posted
Oct 15, 2026
Nov 19, 2026
Public Utility District No. 1 of Lewis County seeks bids for a prefabricated control enclosure for the Jackson Highway Substation, including associated equipment, delivery, off-loading, installation, and field services. This sealed-bid Invitation for Bid requires a bid bond for bids of $120,000 or more, and vendors must be licensed in Washington or commit to obtain a license. Completion is due by October 1, 2027, and the award is expected on December 15, 2026.
Lewis County Public Utility District 1
Special DistrictWA
Posted
Oct 15, 2026
Nov 19, 2026
Public Utility District No. 1 of Lewis County seeks bids for a prefabricated control enclosure for the Jackson Highway Substation, including associated equipment, delivery, off-loading, installation, and field services. This sealed-bid Invitation for Bid requires a bid bond for bids of $120,000 or more, and vendors must be licensed in Washington or commit to obtain a license. Completion is due by October 1, 2027, and the award is expected on December 15, 2026.
Special DistrictMS
Posted
Sep 17, 2026
Oct 20, 2026
69KV substation circuit breaker (material only).
CityIL
Posted
Oct 6, 2026
Nov 5, 2026
Project involves the construction of a new 138kv substation consisting of: one (1) 138kv circuit breaker; two (2) transmission line deadend arbors; one (1) incoming transmission line span; one (1) 23' x14' control enclosure; one (1) backup emergency propane tank and generator; and other miscellaneous switching, bus, and metering equipment.