Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The North Carolina Department of Transportation (NCDOT) seeks to award an agency-specific term contract for the bulk supply of specified fuel additives used to treat underground fuel storage tanks, to be stocked at NCDOT’s Central Inventory Warehouse. The contract requires suppliers to provide specific, formulation-compatible products (or documented equivalents) and comply with state HUB and registration requirements. The initial term is three years with possible extension, with delivery to NCDOT’s Central Inventory Warehouse in Raleigh, NC.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Proposals for the removal of an underground storage tank.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Proposals for the removal of an underground storage tank.
AvailableAbandonment in place of a 4,000 gallon underground storage tank. Three 10,000 gallon petroleum underground tanks will be removed.
Posted Date
Jan 10, 2026
Due Date
Jan 27, 2026
Release: Jan 10, 2026
Close: Jan 27, 2026
Abandonment in place of a 4,000 gallon underground storage tank. Three 10,000 gallon petroleum underground tanks will be removed.
AvailableUnderground storage tank removal mechanical.
Posted Date
Jan 4, 2026
Due Date
Feb 10, 2026
Release: Jan 4, 2026
Close: Feb 10, 2026
Underground storage tank removal mechanical.
AvailableRemoving and replacing existing underground storage tank fuel lines with approx. sixty four (64) feet (thirty two (32) feet supply and thirty two (32) feet return) of one (1) inch diameter ul 971 rated double-walled flex piping. Install 24" x 24" fiberglass transition sump with leak detector and connect to veeder-root panel.
Posted Date
Jan 7, 2026
Due Date
Jan 23, 2026
Release: Jan 7, 2026
Close: Jan 23, 2026
Removing and replacing existing underground storage tank fuel lines with approx. sixty four (64) feet (thirty two (32) feet supply and thirty two (32) feet return) of one (1) inch diameter ul 971 rated double-walled flex piping. Install 24" x 24" fiberglass transition sump with leak detector and connect to veeder-root panel.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis