Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes work includes the construction of new 80' x 80' pre-engineered metal building aircraft hangar with a single piece hydraulic aircraft door, site clearing, earthwork, drainage work, new asphalt pavement section to construct a taxilane and an apron area, electrical and lighting work, and related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 110-FT by 70-FT aircraft storage hangar building with offices; utility service connections to the building; demolition of existing and construction of new fencing; owner work includes constructing site improvements including pavements for new parking lot with driveway and new aircraft apron pavements; as well as carpentry, electrical and plumbing work in the offices and mezzanine storage area.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
Work includes 110-FT by 70-FT aircraft storage hangar building with offices; utility service connections to the building; demolition of existing and construction of new fencing; owner work includes constructing site improvements including pavements for new parking lot with driveway and new aircraft apron pavements; as well as carpentry, electrical and plumbing work in the offices and mezzanine storage area.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Constructs a multi-story concrete masonry unit (cmu) and metal panel construction building on pile foundation with reinforced concrete slab, structural steel framing, reinforced masonry walls, brick veneer, and standing seam metal roof. The new building will be an f-35b joint strike fighter (jsf) training squadron and legacy compliant aircraft maintenance hangar consisting of high bay space, crew and equipment space, administrative space, and data network areas.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Constructs a multi-story concrete masonry unit (cmu) and metal panel construction building on pile foundation with reinforced concrete slab, structural steel framing, reinforced masonry walls, brick veneer, and standing seam metal roof. The new building will be an f-35b joint strike fighter (jsf) training squadron and legacy compliant aircraft maintenance hangar consisting of high bay space, crew and equipment space, administrative space, and data network areas.
AvailableConstruction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
Posted Date
Nov 24, 2025
Due Date
Jul 2, 2026
Release: Nov 24, 2025
Close: Jul 2, 2026
Construction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
AvailableThe U.S. Army Corps of Engineers, Honolulu District issued Solicitation W9128A26RA004 for construction of an Aircraft Maintenance Hangar at Wheeler Army Airfield, Oahu, Hawaii. Proposals must be submitted via the PIEE Solicitation Module and offerors must register in PIEE; attachments are maintained in PIEE rather than as a single public PDF. The solicitation is full & open (NAICS 236220), estimated between $40M–$90M, and has a proposal due date of July 2, 2026, 8:00 PM EDT.
Posted Date
Nov 25, 2025
Due Date
Jul 3, 2026
Release: Nov 25, 2025
Close: Jul 3, 2026
The U.S. Army Corps of Engineers, Honolulu District issued Solicitation W9128A26RA004 for construction of an Aircraft Maintenance Hangar at Wheeler Army Airfield, Oahu, Hawaii. Proposals must be submitted via the PIEE Solicitation Module and offerors must register in PIEE; attachments are maintained in PIEE rather than as a single public PDF. The solicitation is full & open (NAICS 236220), estimated between $40M–$90M, and has a proposal due date of July 2, 2026, 8:00 PM EDT.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →