Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Keystone Heights Airport's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Keystone Heights Airport
Provide fabrication and delivery of a 5k jet-a refueler truck.
Posted Date
Apr 24, 2025
Due Date
May 15, 2025
Release: Apr 24, 2025
Keystone Heights Airport
Close: May 15, 2025
Provide fabrication and delivery of a 5k jet-a refueler truck.
Keystone Heights Airport
Work includes work includes the construction of new 80' x 80' pre-engineered metal building aircraft hangar with a single piece hydraulic aircraft door, site clearing, earthwork, drainage work, new asphalt pavement section to construct a taxilane and an apron area, electrical and lighting work, and related work.
Posted Date
Apr 24, 2025
Due Date
May 29, 2025
Release: Apr 24, 2025
Keystone Heights Airport
Close: May 29, 2025
Work includes work includes the construction of new 80' x 80' pre-engineered metal building aircraft hangar with a single piece hydraulic aircraft door, site clearing, earthwork, drainage work, new asphalt pavement section to construct a taxilane and an apron area, electrical and lighting work, and related work.
Keystone Heights Airport
Work includes installation of chain link fence, a cantilever gate, gate operator, and power poles to tie into the existing perimeter fence where the new west side service road meets sr-100. Installation of the electric gate and power poles will require underground conduit and wiring, partial demolition of the existing asphalt, and concrete pad installation. Partial demolition of the existing fence shall occur once the proposed fence and electric gate are fully operational.
Posted Date
Oct 24, 2024
Due Date
Nov 21, 2024
Release: Oct 24, 2024
Keystone Heights Airport
Close: Nov 21, 2024
Work includes installation of chain link fence, a cantilever gate, gate operator, and power poles to tie into the existing perimeter fence where the new west side service road meets sr-100. Installation of the electric gate and power poles will require underground conduit and wiring, partial demolition of the existing asphalt, and concrete pad installation. Partial demolition of the existing fence shall occur once the proposed fence and electric gate are fully operational.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.