Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cortland County, NY is soliciting sealed bids for construction of a conventional aircraft storage hangar building with offices at the Cortland County Airport – Chase Field. Sealed bids will be accepted at the County Highway Department until 2:00 PM local time on Thursday, January 29, 2026, when they will be publicly opened and read aloud. A pre‑bid meeting is scheduled for January 13, 2026, and bid documents are available via the County’s plan holder portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes construction of a 12,000 SF aircraft storage hangar with associated taxilane and apron earthwork, drainage, and asphalt pavement. Work also includes 463 cy of UNCLASSIFIED EXCAVATION; 1396 cy of EMBANKMENT IN PLACE; 430 lf of SILT FENCE; 322 sf of PAVEMENT MARKING; 257 ton of 4" ASPHALT CONCRETE BASE; 1320 sy of 8" AGGREGATE BASE; 128 ton of 2" ASPHALT SURFACE COURSE; 160 lf of SAWING AND SEALING JOINT; 76 lf of PIPE FOR WATER DISTRIBUTION SYSTEMS; 700 lf of 2" GAS SERVICE;
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a 12,000 SF aircraft storage hangar with associated taxilane and apron earthwork, drainage, and asphalt pavement. Work also includes 463 cy of UNCLASSIFIED EXCAVATION; 1396 cy of EMBANKMENT IN PLACE; 430 lf of SILT FENCE; 322 sf of PAVEMENT MARKING; 257 ton of 4" ASPHALT CONCRETE BASE; 1320 sy of 8" AGGREGATE BASE; 128 ton of 2" ASPHALT SURFACE COURSE; 160 lf of SAWING AND SEALING JOINT; 76 lf of PIPE FOR WATER DISTRIBUTION SYSTEMS; 700 lf of 2" GAS SERVICE;
AvailableDesign-Build Services for an Aircraft Hangar Project.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Design-Build Services for an Aircraft Hangar Project.
AvailableConstructs a multi-story concrete masonry unit (cmu) and metal panel construction building on pile foundation with reinforced concrete slab, structural steel framing, reinforced masonry walls, brick veneer, and standing seam metal roof. The new building will be an f-35b joint strike fighter (jsf) training squadron and legacy compliant aircraft maintenance hangar consisting of high bay space, crew and equipment space, administrative space, and data network areas.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Constructs a multi-story concrete masonry unit (cmu) and metal panel construction building on pile foundation with reinforced concrete slab, structural steel framing, reinforced masonry walls, brick veneer, and standing seam metal roof. The new building will be an f-35b joint strike fighter (jsf) training squadron and legacy compliant aircraft maintenance hangar consisting of high bay space, crew and equipment space, administrative space, and data network areas.
AvailableConstruction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
Posted Date
Nov 24, 2025
Due Date
Jul 2, 2026
Release: Nov 24, 2025
Close: Jul 2, 2026
Construction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →