Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of East Longmeadow issued an Open Market solicitation for Building Automation System Upgrades to convert existing Schneider Electric Continuum BAS software and servers to the Schneider Electric EcoStruxure Building Operation (EBO) platform. The project aims to modernize municipal BAS infrastructure while maintaining compatibility with existing field devices and ensuring continuity of operations across multiple facilities. The solicitation was posted on January 28, 2026, with proposals due by February 11, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Installation and software upgrades of the delta controls (non-proprietary) building automation system (BAS), energy management system (EMS), and troubleshoot the heating, ventilation (HVAC) system.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Installation and software upgrades of the delta controls (non-proprietary) building automation system (BAS), energy management system (EMS), and troubleshoot the heating, ventilation (HVAC) system.
AvailableInstallation and software upgrades of the delta controls (non-proprietary) building automation system (BAS), energy management system (EMS), and troubleshoot the heating, ventilation (HVAC) system.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Installation and software upgrades of the delta controls (non-proprietary) building automation system (BAS), energy management system (EMS), and troubleshoot the heating, ventilation (HVAC) system.
AvailableProvide building automation system (BAS) for our proton therapy center (ptc1) building. The system will need to be upgraded to the Niagara front end system.
Posted Date
Dec 18, 2025
Due Date
Feb 2, 2026
Release: Dec 18, 2025
Close: Feb 2, 2026
Provide building automation system (BAS) for our proton therapy center (ptc1) building. The system will need to be upgraded to the Niagara front end system.
AvailableUpgrades to the low-voltage systems in the first-floor detention area, including modifications to cell and entry door controls, replacement of audio and video surveillance equipment, installation of HVAC systems, and conversion of a storage room into a climate-controlled telecommunications room, including ancillary work.
Posted Date
Oct 20, 2025
Due Date
Feb 19, 2026
Release: Oct 20, 2025
Close: Feb 19, 2026
Upgrades to the low-voltage systems in the first-floor detention area, including modifications to cell and entry door controls, replacement of audio and video surveillance equipment, installation of HVAC systems, and conversion of a storage room into a climate-controlled telecommunications room, including ancillary work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis