Summary
Work includes removal of all identified wet substrate materials. Install new materials to match existing; remove all flashing material and preparation for installation of new flashings; repair all membrane and defects; installation of new cover board in accordance with the manufacturer s requirements to achieve a fm 1-90 approved assembly; mechanically fasten new cover board through all existing roofing, coverboard, insulation, and metal deck; inspect the underside of the roof deck prior to beginning to identify all conduit/piping/etc. Under the deck; adhere to the new 80 mil fleeceback membrane to the cover board. See outside link.