Trumbull Metropolitan Housing Authority
Special DistrictOH
Jul 4, 2026
Closes
Sep 3, 2026
Girard Scattered Exterior Renovations
Girard Scattered Exterior Renovations.
Description: Work inlcudes concrete repair and restoration, soffit and fascia repair and replacement, gutter and downspout repair and replacement, stucco repair and restoration, exterior painting, caulking and sealants, exterior electrical work.
SpecialDistrict · FL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Trumbull Metropolitan Housing Authority
Special DistrictOH
Jul 4, 2026
Closes
Sep 3, 2026
Girard Scattered Exterior Renovations.
Aug 17, 2026
Closes
Sep 9, 2026
The work generally includes the renovation in a design build format, for the demolition of the bell tower and other exterior elements to be capped and made watertight and airtight from exterior conditions using acceptable means and construction to obtain a final product.
CityMS
Aug 19, 2026
Closes
Sep 17, 2026
The City of Greenville, Mississippi is soliciting proposals for the “BATHROOM RENOVATIONS” project at the Greenville Municipal Golf Clubhouse. Proposals are to be received at the City Clerk’s Office in City Hall, 340 Main Street, Greenville, Mississippi, by September 17, 2026 at 2:00 p.m. local time. The located notice does not identify a primary PDF, DOC, or PPT attachment and contains no grant-program language for this bid.
CityCT
Aug 14, 2026
Closes
Sep 3, 2026
Perform improvements to the tee box areas of holes. The work includes tee box reconstruction, grading, fill placement, top-mix installation, finish grading, and installation of new turf. Remove existing tee surface material and prepare the existing tee complex and surrounding ground for reconstruction; raise the existing tee boxes approx., 18" above existing grade, with grading and tie-ins to surrounding ground as necessary; expand the rear tee box approx., 15' forward, generally in accordance with the attached concept drawing; expand the forward tee box by approx., 15' to the rear and 5' to the left. This is a planning estimate; final field dimensions shall be confirmed with RGC management before construction; grade new and existing slopes as appropriate to provide stable transitions, proper drainage, and a playable finished surface, while avoiding the need for new retaining walls where practical. See attached file.
Decision makers connected to this RFP from Fort Myers City Housing Authority.