Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Street streetscape and roadway improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consist of approx 324 LF driveway curb and gutter; 1,570 4" yellow class 1 pavement marking paint; 1,497.8 SY 6" concrete sidewalk; 1 LS lighting conduits; 2,705.1 7" non-reinforced concrete pavement.
Posted Date
Feb 3, 2025
Due Date
Dec 18, 2025
Release: Feb 3, 2025
Close: Dec 18, 2025
The work consist of approx 324 LF driveway curb and gutter; 1,570 4" yellow class 1 pavement marking paint; 1,497.8 SY 6" concrete sidewalk; 1 LS lighting conduits; 2,705.1 7" non-reinforced concrete pavement.
AvailablePremium
Access the largest public sector contact database
Work includes 56 unit tree removal; 3 EA inlet and pipe protection; 7,626 SF portland cement concrete sidewalk, 4"; 990 SY aggregate base course, type b 4"; 20 SF detectable warnings; 123 LF combination curb and gutter removal; 90 LF planter curb; 7,875 sf sidewalk removal; 73 SY 10 driveway removal; 6 SY pavement removal; 123 LF combination concrete curb and gutter, type m-6. 18 (modified); 188 LF telescoping steel sign support; 31 SF sign panel, type 1; 4 EA removing and resetting street signs; 2 EA remove and relocate trash receptacle; 3 EA bike rack removal; 1,194 SF stamped, colored portland cement concrete sidewalk, 4". See attached file.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
Work includes 56 unit tree removal; 3 EA inlet and pipe protection; 7,626 SF portland cement concrete sidewalk, 4"; 990 SY aggregate base course, type b 4"; 20 SF detectable warnings; 123 LF combination curb and gutter removal; 90 LF planter curb; 7,875 sf sidewalk removal; 73 SY 10 driveway removal; 6 SY pavement removal; 123 LF combination concrete curb and gutter, type m-6. 18 (modified); 188 LF telescoping steel sign support; 31 SF sign panel, type 1; 4 EA removing and resetting street signs; 2 EA remove and relocate trash receptacle; 3 EA bike rack removal; 1,194 SF stamped, colored portland cement concrete sidewalk, 4". See attached file.
AvailableConstruction of phases 1 and 2 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs, sidewalk, and HMAC; water quality ponds; erosion & sedimentation controls; lot moisture conditioning; and various other improvements.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Construction of phases 1 and 2 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs, sidewalk, and HMAC; water quality ponds; erosion & sedimentation controls; lot moisture conditioning; and various other improvements.
AvailableProvide water system extension. Work includes construction of 12" water main; 2" water main; gate valves; fire hydrants; water services; and miscellaneous appurtenances.
Posted Date
Oct 14, 2025
Due Date
Jan 6, 2026
Release: Oct 14, 2025
Close: Jan 6, 2026
Provide water system extension. Work includes construction of 12" water main; 2" water main; gate valves; fire hydrants; water services; and miscellaneous appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis