CityFL
Posted
Jul 9, 2026
Oct 14, 2026
Stirling Avenue Bridge Replacement
Work includes maintenance of traffic, 613 LF of sediment barrier, 13 SY removal of existing concrete, 13 cy regular excavation, 610 SY type b stabilization, 67 tn asphalt concrete friction course, traffic c, fc-12. 5, pg 76-22, 1 EA inlets, curb, type 10, <10', 33 LF pipe culvert, optional material, round, 15"sd, 41 LF concrete curb, type d. See attached file.