Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide bridge abutment & footing repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of structural repairs to Abutment B and bearing rehabilitation for Trusses C and D of the Purple People Bridge. Work includes, but is not limited to, temporary support and jacking operations, selective removal of deteriorated material, reinforced concrete bearing reconstruction, installation of steel components, and related restoration work.
Posted Date
Jan 6, 2026
Due Date
Feb 6, 2026
Release: Jan 6, 2026
Close: Feb 6, 2026
The project consists of structural repairs to Abutment B and bearing rehabilitation for Trusses C and D of the Purple People Bridge. Work includes, but is not limited to, temporary support and jacking operations, selective removal of deteriorated material, reinforced concrete bearing reconstruction, installation of steel components, and related restoration work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of North Carolina School of the Arts is soliciting proposals for the Kudzu Valley Bridge Abutment Repair project. Bids are scheduled to be opened on January 29, 2026, at 2:00 pm. Interested parties can obtain complete plans and specifications from the design firm, SKA.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
The University of North Carolina School of the Arts is soliciting proposals for the Kudzu Valley Bridge Abutment Repair project. Bids are scheduled to be opened on January 29, 2026, at 2:00 pm. Interested parties can obtain complete plans and specifications from the design firm, SKA.
AvailableProject consists of removing and replacing the existing bridge with a 59.00' bk-bk abutment precast prestressed concrete deck beam bridge on pile bent abutments. Major work items include: 491 Ton Stone Riprap, Class A5; 159 Ton Agg Base Course, Ty B; 245 SY Pavement Removal; 1 Each Removal of Existing Structures; 27.0 CY Concrete Structures; 1,368 SF PPC Deck Beams (27" Depth); 3,580 Pounds Reinforcement Bars; 118 LF Steel Railing, Type S1; 120 LF Furn. and Drive Steel Piles HP10x42; 2 Each Test Pile Steel HP10x42; 2 Each Traffic Barrier Terminal, Type 5A and Type 1 (Special) Tangent
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Project consists of removing and replacing the existing bridge with a 59.00' bk-bk abutment precast prestressed concrete deck beam bridge on pile bent abutments. Major work items include: 491 Ton Stone Riprap, Class A5; 159 Ton Agg Base Course, Ty B; 245 SY Pavement Removal; 1 Each Removal of Existing Structures; 27.0 CY Concrete Structures; 1,368 SF PPC Deck Beams (27" Depth); 3,580 Pounds Reinforcement Bars; 118 LF Steel Railing, Type S1; 120 LF Furn. and Drive Steel Piles HP10x42; 2 Each Test Pile Steel HP10x42; 2 Each Traffic Barrier Terminal, Type 5A and Type 1 (Special) Tangent
Release: Jan 8, 2026
Close: Jan 29, 2026
Bridge repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →