Summary
Work includes replace the fender system (including the fender pile installation) on a 98-year-old bascule bridge, temporary traffic control for the walkway, roadway and waterway; utilities location verification; existing bascule bridge operation; furnish & install temporary electrical power system; remove & re-install navigation lights; furnish & install clearance gauge; removal of existing fender system and existing fender piles; design of the new fender piles; phased removal of existing fender system and construction of new fender system including fender piles to protect the existing structure including the bascule pier at all times.