Closing soon

Breathing Air Machine Repair and Shop Air Compressor Maintenance RFP

Description: The contractor shall provide all personnel, tools, equipment, materials, and supervision to perform a five-part project. The key requirements include: part 1: replace the failing water separator trap and drain assembly on the breathing air system. Part 2: install a drip leg with a ball valve at the inlet of the breathing air dryer to collect excess condensate. Part 3: replace both tower pressure switches on the hankinson model 95cba air dryer and resolve any recorded faults. Part 4: replace eight (8) wilkerson in-line filter elements within the breathing air distribution lines. Part 5: provide comprehensive annual service for two (2) chicago pneumatic air compressors, including filter and oil changes, system checks, cleaning, and operational testing.

Buyer
Released
Aug 18, 2026
Closes
Aug 23, 2026(2 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts