Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Botkins
The work for which proposals are invited consists of approx. 1,100 LF of street reconstruction to include curb, gutter, sidewalk, and drive approaches along with water line and storm drainage replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Abilene
Work includes removal and replacement of existing roller compacted concrete alley sections. The new section for the alleys specified shall be 7" class "p" concrete (hi-early) reinforced with #4 bars at 18" on center each way. 12 sta prepare right-of-way; 2,859 sy subgrade preperation; 2,859 sy remove & replace concrete pavement (7")(class p, hiearly); 3 mo signs, barricades, and traffic handling.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
City of Abilene
Close: Dec 2, 2025
Work includes removal and replacement of existing roller compacted concrete alley sections. The new section for the alleys specified shall be 7" class "p" concrete (hi-early) reinforced with #4 bars at 18" on center each way. 12 sta prepare right-of-way; 2,859 sy subgrade preperation; 2,859 sy remove & replace concrete pavement (7")(class p, hiearly); 3 mo signs, barricades, and traffic handling.
AvailableCity of Littleton
Owner's Representative to manage and oversee design and construction for the Main Street Improvements - Phase I of Project Downtown. The Owner’s Rep should bring expertise in project management, urban design coordination.
Posted Date
Oct 24, 2025
Due Date
Dec 9, 2025
Release: Oct 24, 2025
City of Littleton
Close: Dec 9, 2025
Owner's Representative to manage and oversee design and construction for the Main Street Improvements - Phase I of Project Downtown. The Owner’s Rep should bring expertise in project management, urban design coordination.
AvailableCity of Malad City
Reconstruction of approx 2,470-feet, including intersection tie-ins. Work includes removal of the existing bituminous surface, placement of granular subbase and base to bring to new grade, and repair of any unsuitable subgrade areas as encountered. Other items include adjustment of manhole covers and valve covers, installation of 12 storm sewer pipe, pavement markings, and concrete gutters.
Posted Date
Nov 13, 2025
Due Date
Dec 4, 2025
Release: Nov 13, 2025
City of Malad City
Close: Dec 4, 2025
Reconstruction of approx 2,470-feet, including intersection tie-ins. Work includes removal of the existing bituminous surface, placement of granular subbase and base to bring to new grade, and repair of any unsuitable subgrade areas as encountered. Other items include adjustment of manhole covers and valve covers, installation of 12 storm sewer pipe, pavement markings, and concrete gutters.
AvailableTown of Gibraltar
Project involves the reconstruction of existing roads, parking areas, storm sewer including sheet pile sea wall discharge, and pedestrian facilities. Also includes the installation of additional concrete sidewalks, concrete curb and gutter, concrete retaining walls, pedestrian railings, ADA accessible ramps, street/intersection lighting with control cabinet, concrete steps, dry hydrant water system, stormwater management structure, landscape restoration, and pavement markings.
Posted Date
Nov 4, 2025
Due Date
Nov 19, 2025
Release: Nov 4, 2025
Town of Gibraltar
Close: Nov 19, 2025
Project involves the reconstruction of existing roads, parking areas, storm sewer including sheet pile sea wall discharge, and pedestrian facilities. Also includes the installation of additional concrete sidewalks, concrete curb and gutter, concrete retaining walls, pedestrian railings, ADA accessible ramps, street/intersection lighting with control cabinet, concrete steps, dry hydrant water system, stormwater management structure, landscape restoration, and pavement markings.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis