Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 90 Cy earth excavation; 30 CY excavation and reuse of existing channel bottom material; 1 LS water handling (site no 1); 1 LS water handling (site no 2); 15 CY granular fill; 120 LF sedimentation control system; 10 CF cement rubble masonry; 60 SY repointed masonry; 50 CY intermediate riprap; 600 LF steel backed timber guiderail; 4 EA steel-backed timber guiderail end anchorage type I. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 8, 2026
Close: Jan 29, 2026
Bridge Repairs.
Available600 Ea key switch conrail 102 numbered sar 102CR #SAR102STP (Sargent & Greenleaf 0880-047-102STP).
Posted Date
Jan 21, 2026
Due Date
Jan 26, 2026
Release: Jan 21, 2026
Close: Jan 26, 2026
600 Ea key switch conrail 102 numbered sar 102CR #SAR102STP (Sargent & Greenleaf 0880-047-102STP).
Request for proposals for grading, mill bituminous surface, bituminous surfacing, and bridge work on Arrowhead Trail (C.S.A.H. 16) from T.H. 61 to Tower Road in Hovland, MN.
Posted Date
Jan 17, 2026
Due Date
Feb 10, 2026
Release: Jan 17, 2026
Close: Feb 10, 2026
Request for proposals for grading, mill bituminous surface, bituminous surfacing, and bridge work on Arrowhead Trail (C.S.A.H. 16) from T.H. 61 to Tower Road in Hovland, MN.
AvailablePennDOT is presenting a virtual plans display for the South River Road (Route 147) bridge rehabilitation over Powells Creek in Reed Township, Dauphin County. The public display and comment period run from January 5, 2026 through February 4, 2026, and the project involves preservation work such as gunite removal, masonry repointing, drains and waterproofing, and roadway/guide rail reconstruction. This is an active PennDOT project information/engagement posting, not a grant or award notice.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
PennDOT is presenting a virtual plans display for the South River Road (Route 147) bridge rehabilitation over Powells Creek in Reed Township, Dauphin County. The public display and comment period run from January 5, 2026 through February 4, 2026, and the project involves preservation work such as gunite removal, masonry repointing, drains and waterproofing, and roadway/guide rail reconstruction. This is an active PennDOT project information/engagement posting, not a grant or award notice.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis