CityTX
Posted
Sep 11, 2026
Oct 8, 2026
Citywide Work Orders for Neighborhood Traffic Management Program (NTMP) Project #8 RFP
Work includes 250 EA installation of traffic sign (with new foundation, post and hardware); 100 SY remove and dispose of asphaltic surface with or without base (all thicknesses); 100 SY removing and disposing of concrete pavements (including all thickness, w/ or w/o asphalt, including base & subgrade, w/ or w/o curb, all depths); 150 ton type a hot mix asphaltic base course; 350 ton type d hot mix asphaltic concrete pavement; 50 SY reinforced concrete pavement 6" thick; 50 SY cement stabilized base course 6- to 8" thick. See outside link.