CitySC
Posted
-
Dec 10, 2026
BOLIN ROAD RECONSTRUCTION PROJECT MANUAL RFP
Reconstruction of approximately 0.6 miles of City-owned road, including asphalt milling and pavement replacement.
Description: Project consists of reconstructing approx 0.6 miles of city owned secondary road. Reconstruction will consist of milling existing asphalt & base and replacing with one of two proposed pavement sections.
City · SC, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of North Augusta.
Adjacent opportunities open for bidding right now.
CitySC
Posted
-
Dec 10, 2026
Reconstruction of approximately 0.6 miles of City-owned road, including asphalt milling and pavement replacement.
CountyTX
Posted
Oct 23, 2026
Nov 24, 2026
work includes : 19,614 SY concrete pavement (8 in depth); 3,640 SY concrete sidewalk (4-12" depth); 7,271 LF trench excavation protection (5' to 10' depth) 10 EA concrete manhole (pre-cast) 72" circular, standard depth; 67 LF 12" diameter PVC water line, open cut; see attached file.
CountyKS
Posted
Nov 17, 2026
Dec 18, 2026
Assaria Road Construction
CityOH
Posted
-
Nov 24, 2026
Work include removal and replacement of the full depth of the road, storm drainage additions, the addition of sidewalk on both sides of the roadway, and re-striping of the pavement to include bike lanes.