Retrieving RFP details
Release
Close
Libertas Academy-Boiling Springs
Boiling Springs Carwash - New Construction.
New Hampshire Department of Administrative Services
Vehicle springs and components.
Washoe County School District
Construction of new elementary school. Phased construction of a new approx 100,000 sf two (2)-story elementary school. Work includes, grading, paving, landscaping and irrigation, underground utilities, masonry, structural steel, plumbing, hvac and electrical, membrane roofing, architectural metal stud walls, insulation, aluminum framed windows, doors, frames and door hardware, casework, insulation, painting and flooring. The construction of a new playground shall be completed after the old school is demolished.
City of Bowling Green
Construction of a 5' wide sidewalk extension to allow for safer pedestrian traffic along three springs road and fieldstone boulevard. This project will feature sidewalk, ADA ramps, and striping.
Release
-
Close
Nov 06, 2025