Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition includes removing the three boilers and their controls, removing hydronic piping that is between the boilers and the zone pumps on the supply side, and removing the hot water return header. The zone pumps will remain, and the concrete pad may remain and be increased to accommodate the new boiler size. Gas piping will remain but may need minor modifications. The existing flue will be removed. The new work includes providing three Weil McClain Slimfit condensing boilers model SF750. These boilers are chosen because of their short design; they will fit into the existing boiler room that does not have a high ceiling. Each boiler will be vented to the exterior with 8’’ vents that should rise to the roof in the existing boiler chimney. The vent material shall be PVC, CPVC, PP, or AL29-4C. The new boilers shall come with a new control system that automatically operates the boilers and provides cascading loading and shall equalize run time per boiler. New boiler circulator pumps will be provided per boiler. New emergency shut off switches will be provided next to each exit door in the boiler room. Condensate neutralizers shall be provided to treat the acidic condensate from the boilers. Provide a new floor drain near the boilers that will tie into existing sanitary serving the adjacent bathroom. Boiler condensate shall spill into this floor drain. New supply piping headers to be provided and taps provided to connect to existing zone pumps. New return piping headers to be provided and taps provided connect into existing return branch piping. Insulate all heating-water piping according to the chart in public notice and design report attachments, where the size on the top row is pipe size and the size on the bottom row is the insulation thickness. Miscellaneous improvements include replacement of baseboard radiator in clerical office for increased heat. Repair or replacement of a rooftop unit that contains a duct hot water coil. Hot water flowing through this valve when the unit is not calling for heat. It is possible there is a leaky valve. Address any leaks or failing heaters in basement garage space.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Municipal building boiler replacement. Modification of existing steam, make-up water and gas piping to new boiler, new vent connection to the existing chimney, and reconnection of boiler power supply.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Municipal building boiler replacement. Modification of existing steam, make-up water and gas piping to new boiler, new vent connection to the existing chimney, and reconnection of boiler power supply.
AvailableReplacement of the municipal building roof in the borough.
Posted Date
Jan 18, 2026
Due Date
Jan 28, 2026
Release: Jan 18, 2026
Close: Jan 28, 2026
Replacement of the municipal building roof in the borough.
AvailableProvide municipal building exterior trim replacement.
Posted Date
Jan 15, 2026
Due Date
Feb 11, 2026
Release: Jan 15, 2026
Close: Feb 11, 2026
Provide municipal building exterior trim replacement.
AvailableThe project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis