School DistrictCA
Posted
-
Sep 30, 2026
BNR Walkway Structural Improvements
Santa Rosa City Schools is soliciting a construction contractor to strengthen an existing cantilevered walkway by installing nine stainless steel hollow structural section bracing brackets, including pre-scanning and epoxy-anchor drilling. Bidders must hold a valid General Engineering Contractor - Class A license, follow the project drawings and specifications, and perform the required scanning, drilling, and anchor installation; the estimated contract cost is $280,000.00. The open solicitation is identified as Bid #10000087 and has a response deadline of September 30, 2026.