Summary
Work includes grading, installation of drainage, a new box culvert, asphalt and concrete pavement, roundabout construction, curb and gutter, sidewalk, pavement markings, waterline placement, erosion control and traffic control. 2705 sy removal of asphalt pavement; 44457 cy road & drainage excavation (unclassified); 55824 cy borrow excavation (unclassified); 3993 cy placing and spreading topsoil; 7500 cy undercutting; 29 cy foundation fill material; 480 lf 12" temporary slope drain; 680 cy sediment removal; 685 lf temporary silt fence (with backing); 4415 lf temporary silt fence (without backing); 2 each sediment filter bag (15' x 10'). See outside link.