South Waldron Road Improvements RFP
Posted
Nov 3, 2026
Dec 7, 2026
Work includes 100 SY removal of rigid pavement, sidewalks, 500 SY removal of asphalt pavement, 227,677 CY road & drainage excavation (unclassified), 17,000 cy borrow excavation (unclassified), 6,100 CY placing and spreading topsoil, 1,650 LF temporary silt fence (with backing), 3 CY class a concrete (roadway), 904 SF retaining wall (retaining wall #1), 351 LF 42" concrete pipe culvert (class iii). See attached file.