Summary
Work includes clearing and grubbing, 6500 CY regular excavation, 11000 CY borrow excavation, 500 SY geotextile subgrade stabilization, 330 CY minor structure excav. box culvert, 550 SY flexible pavement planing 0" - 2", 325 LF ns saw-cut asph conc, 800 SY demolition of pavement flexible, 400 CY unsuitable excavation / undercut (allowance), 400 CY unsuitable excavation replacement (allowance), 880 SF temporary sheet piling, 6000 LF remove existing railroad track and ties, 3600 CY remove existing railroad ballast, 1 EA remove existing box culvert headwall, 770 LF storm sewer pipe 15", 5 EA 15" end section es-1 or 2, 1 EA 24" end section es-1 or 2, 160 LF storm sewer pipe 18", 18 LF 18" steel pipe (extend exist.). See attached file.