CountyOH
Posted
Sep 2, 2026
Sep 17, 2026
Summit County Jail - Generator Replacement RFP
Procurement of generator replacement services for Summit County Jail.
Description: Blacktop replacement at the County Jail. General specs include: Locate all electrical, phone and fiber, water lines before removal of blacktop. Remove existing blacktop. Add base course to all areas as needed, finish grade, compact, slope away from building and sidewalk areas next to building, slope according to present slope. Pave all areas with 1 1/2" binder blacktop and roll compact. Stripe all parking, handicap stalls . See attached file.
County · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyOH
Posted
Sep 2, 2026
Sep 17, 2026
Procurement of generator replacement services for Summit County Jail.
CountyOH
Posted
Sep 8, 2026
Sep 22, 2026
This RFP is for the Summit County Jail - Door & Intercom Control Replacement.
CountyOH
Posted
-
Oct 6, 2026
The Board of County Commissioners of Pickaway County is accepting sealed bids for door hardware, controls, and window replacement at the Pickaway County Jail. Questions and electronic copies of the contract documents are available from Christina Cave at WDC Group via cavec@wdc-group.com. Bids must be sealed, addressed to the Board with attention to Marc Rogols, and submitted by 10:30 a.m. local time on October 6, 2026, for public opening in Circleville, Ohio.
CountyGA
Posted
Aug 19, 2026
Sep 17, 2026
As of 2026-08-22, Brooks County Board of Commissioners is soliciting bids for a construction project, not a grant program, although the project is funded by a local SPLOST grant. The work consists of removing and replacing 40 shower stalls in the upstairs and downstairs areas of the Brooks County Jail, including all required labor, materials, equipment, and associated measures. The contract will be awarded to one contractor, with substantial completion required within 180 consecutive calendar days and close-out within 194 days; Georgia licensing, bid and performance/payment bonds, and E-Verify compliance are required.
Decision makers connected to this RFP from Columbia County.