CityWI
Posted
Sep 14, 2026
Sep 28, 2026
Swan Road Culvert Replacement
Project consists of but not limited to approx. 2 EA Removing Small Pipe Culverts; 26 SY Removing Asphaltic Surface; 3 TN Base Aggregate Dense 3/4"; 21 TN Base Aggregate Dense 1 1/4"; 5 TN Asphaltic Surface; 70 LF Pipe Arch Corrugated Steel 42x29"; 7 CY Riprap Medium; 38 SY Topsoil.