Virginia Department of Military Affairs
State AgencyVA
Posted
Aug 20, 2026
Sep 16, 2026
Trimble Road Culvert Failure Replacement
Work includes approx 60 LF 48" CMP polymer coated arched/elongated pipe culvert.
Description: The City of Kirby wants to remove the existing culvert crossing on Ackerman Road and replace it with new box culverts. The work also includes rebuilding the pavement approaches, adding pavement markings, and re-grading the parkway. It is an IFB construction solicitation, with plans, addenda, and bidding managed through CivCast.
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Virginia Department of Military Affairs
State AgencyVA
Posted
Aug 20, 2026
Sep 16, 2026
Work includes approx 60 LF 48" CMP polymer coated arched/elongated pipe culvert.
CityPA
Posted
Aug 11, 2026
Sep 18, 2026
Supply and install all materials to remove 2 existing 36" storm pipes and replace with a 10' x 4' x 30' precast concrete box culvert and related work.
Indigenous GovernmentAB
Posted
Aug 26, 2026
Sep 16, 2026
O’Chiese First Nation is inviting tenders for the O’Chiese I Road Culvert Replacement project. The work generally consists of removing the existing culvert and open-cut installation of an approximately 88 m long, 3000 mm diameter corrugated steel pipe, with associated excavation, foundation preparation, bedding and backfill, concrete end treatments, channel works, riprap erosion protection, watercourse management, traffic accommodation, and reinstatement of the temporary gravel roadway and associated infrastructure. The contractor must maintain public and emergency access throughout construction, with complete requirements set out in the tender documents and contract drawings.
CityVT
Posted
-
Sep 17, 2026
Qualified contractors for the replacement of an existing culvert located on East Cobble Hill Road. The work generally consists of removing an existing approx. 18" diameter culvert, approx. 65 LF in length, 17’ deep on the outlet, 7’deep on the inlet, and installing a new 48-inch diameter culvert supplied by the Town of Barre. The culvert crosses beneath East Cobble Hill Road and is located southeast of 153 East Cobble Hill Road.
Decision makers connected to this RFP from City of Kirby.