CityPA
Posted
Oct 1, 2026
Oct 30, 2026
Hidden Lake Drive Culvert Replacement RFP
Removal and replacement of existing concrete storm sewer structures, 18" CMP pipe, and an 84" CMP culvert with precast storm sewer structures, smooth-lined corrugated polyethylene pipe, a 72" reinforced concrete pipe culvert with wingwalls, riprap stabilization, pavement restoration, and all associated appurtenant work.
