Posted
Sep 30, 2026
Oct 21, 2026
New Construction of a 10' wide paved shared-use trail within the mountain division corridor RFP
New Construction of a 10' wide paved shared-use trail within the mountain division corridor and other incidental work.
Description: New construction of a 10' wide paved shared-use trail within the Mountain Division Corridor in the towns of Fryeburg, Brownfield and Hiram.
StateAgency · ME, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Sep 30, 2026
Oct 21, 2026
New Construction of a 10' wide paved shared-use trail within the mountain division corridor and other incidental work.
Posted
Sep 28, 2026
Oct 20, 2026
Project includes the construction of a single and double track natural surface trails, trailheads, boardwalks and rock crossings.
Posted
Sep 28, 2026
Oct 20, 2026
Procurement for an accessible paved trail loop project, including earthwork, erosion control, paving, and site furniture installation.
Special DistrictAL
Posted
Sep 9, 2026
Oct 8, 2026
Construction of approx 8,000 LF of asphalt multi-use path work also includes approx 1,650 LF of new asphalt and concrete pedestrian paths, scrub seal, restriping, and shared-use bike lane designations in downtown courtland, improvements, signing, and ada-compliant curb ramps and detectable warning surfaces.
Decision makers connected to this RFP from Maine Department of Transportation.