FederalDC
Jul 20, 2026
Closes
Sep 10, 2026
2026 Marcott Coulee Pipeline
Work includes trenching to a minimum 6‑foot bury depth, HDPE pipeline installation, excavation, embankment construction, temporary excavation support, water system assembly installation, watering assemblies, water trough assemblies, curb stop valve assemblies, remote tap assemblies, air‑relief valve assemblies, bedding and backfill placement, gravel placement, wood post installation, erosion‑control practices, and all associated testing required to verify system performance. See attached file.