Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes drainage upgrades and related construction activities within the project area. Land-disturbing work up to the approved 7 acres and requires furnishing all labor, equipment, and materials necessary to complete the drainage improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
AvailableThe City of Loveland, Colorado is requesting sealed proposals to provide Stormwater Engineering Services for the River Improvement Program.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
The City of Loveland, Colorado is requesting sealed proposals to provide Stormwater Engineering Services for the River Improvement Program.
AvailableFor purposes of our Capital Improvement Program selection process, our next major capital improvement project to be final designed and constructed is our Stormwater Improvement Project. This project will be used to evaluate prospective firms. Your firm should specifically present your approach to moving our currently 30% designed capital improvement project forward through final design, approvals, permitting, construction, and project closeout.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
For purposes of our Capital Improvement Program selection process, our next major capital improvement project to be final designed and constructed is our Stormwater Improvement Project. This project will be used to evaluate prospective firms. Your firm should specifically present your approach to moving our currently 30% designed capital improvement project forward through final design, approvals, permitting, construction, and project closeout.
AvailableThe purpose is the procurement of reconstruction services of two existing storm drain inlets, the installation of one new storm drain inlet, associated connecting storm pipes and restoration of stamped asphalt pavement. See attached file for full scope.
Posted Date
Dec 29, 2025
Due Date
Feb 3, 2026
Release: Dec 29, 2025
Close: Feb 3, 2026
The purpose is the procurement of reconstruction services of two existing storm drain inlets, the installation of one new storm drain inlet, associated connecting storm pipes and restoration of stamped asphalt pavement. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →