CityME
Posted
Sep 3, 2026
Sep 23, 2026
Dock 11 & 13 Roof Renovations - BGR
Work includes roof renovations.
Description: Proposals for a go-over roofing solution at Bangor International Airport, Dock 11 (Bldg. 462) and Dock 13 (Bldg. 464).
SpecialDistrict · ME, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityME
Posted
Sep 3, 2026
Sep 23, 2026
Work includes roof renovations.
CityFL
Posted
Sep 15, 2026
Oct 5, 2026
Work includes Annual Dock Maintenance.
CityNC
Posted
Sep 15, 2026
Oct 27, 2026
This project is to enhance, improve and stabilize the existing shore protection retaining wall with a gravity retaining wall composted of stacked concrete-filled, high-strength, synthetic fabric form tubes that are horizontally stepped back with an approximate 1 on 2 vertical wall slope.
Naval Air Systems Command (NAVAIR)
FederalMD
Posted
Jul 27, 2026
Sep 19, 2026
Provide Serco HL hydraulic dock leveler.