Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide all labor and materials for the following projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide ADA/BF toilet rooms modernization. The work, in general, consist of the ADA/BF improvements renovations of flint housing commission office building's existing toilet rooms, including but not limited to the demolition, carpentry, finish flooring, painting, plumbing, electrical & other associated work within the work areas
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
Provide ADA/BF toilet rooms modernization. The work, in general, consist of the ADA/BF improvements renovations of flint housing commission office building's existing toilet rooms, including but not limited to the demolition, carpentry, finish flooring, painting, plumbing, electrical & other associated work within the work areas
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Constructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Constructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
AvailableThe City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
AvailableCity of Joplin solicits sealed bids to purchase the parcel at 1304 Kentucky Ave (JC COX JRS FOURTH ADDITION LOT 119) — approximately 6,000 sq ft, currently zoned R-3. Minimum bid $4,320. City conveys by Quit Claim Deed; buyer assumes closing costs if closing at CB Title Company. Bids submitted to the Finance Department (602 S Main St, 3rd Floor). Contact: Ethan McAfee, 417-624-0820 ext. 1239.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
City of Joplin solicits sealed bids to purchase the parcel at 1304 Kentucky Ave (JC COX JRS FOURTH ADDITION LOT 119) — approximately 6,000 sq ft, currently zoned R-3. Minimum bid $4,320. City conveys by Quit Claim Deed; buyer assumes closing costs if closing at CB Title Company. Bids submitted to the Finance Department (602 S Main St, 3rd Floor). Contact: Ethan McAfee, 417-624-0820 ext. 1239.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →