Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for improvements to the Ben Lomond Transfer Station, including new canopy roofs, sanitary sewer rerouting, spill containment, safety upgrades, concrete wall repairs, electrical upgrades, and interior structural retrofits.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of sanitation transfer station expansion & improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Work consist of sanitation transfer station expansion & improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Electrical Contractor shall provide all labor, materials, equipment, insurance, bonds, permits, and services necessary to complete work. The contract for the Electrical Contractor includes providing a new accessible fire alarm system for the station. The new fire alarm system shall be addressable and contain capability of assuming all existing field devices which are currently in service, with equal quantities of new addressable field devices. Additional capability is required for field devices required to comply with the new design of the station, and the capability of interfacing with new elevators for performance of required capture and control operations. Electrical provisions shall be required for the new fire alarm control and support panels. Following the replacement of the existing fire alarm system, shall be the requirement to decommission and power down the existing fire alarm system for a complete removal of all existing fire alarm control and support equipment and the removal of all unused field devices, including wiring and conduit.
Posted Date
Jan 5, 2026
Due Date
Feb 9, 2026
Release: Jan 5, 2026
Close: Feb 9, 2026
Electrical Contractor shall provide all labor, materials, equipment, insurance, bonds, permits, and services necessary to complete work. The contract for the Electrical Contractor includes providing a new accessible fire alarm system for the station. The new fire alarm system shall be addressable and contain capability of assuming all existing field devices which are currently in service, with equal quantities of new addressable field devices. Additional capability is required for field devices required to comply with the new design of the station, and the capability of interfacing with new elevators for performance of required capture and control operations. Electrical provisions shall be required for the new fire alarm control and support panels. Following the replacement of the existing fire alarm system, shall be the requirement to decommission and power down the existing fire alarm system for a complete removal of all existing fire alarm control and support equipment and the removal of all unused field devices, including wiring and conduit.
AvailableThe Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
AvailableOperations of the Milford Transfer Station.
Posted Date
Nov 17, 2025
Due Date
Jan 21, 2026
Release: Nov 17, 2025
Close: Jan 21, 2026
Operations of the Milford Transfer Station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →