Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seawall Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Fort Lauderdale seeks qualified, licensed contractors to provide construction services for seawall replacements, stormwater improvements, mill and paving, maintenance of traffic (MOT), and striping along Sebastian Street and Seville Street west of Birch Road. Work includes construction of two new steel sheet pile walls, SWPPP implementation, vibration monitoring, drainage installations, curb removals, mill and resurfacing, and preparation of as-built surveys by a Florida-registered surveyor. The procurement is issued as an IFB with an estimated value range $5,000,000–$10,000,000 and a formal response deadline.
Posted Date
Dec 8, 2025
Due Date
Jan 28, 2026
Release: Dec 8, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fort Lauderdale seeks qualified, licensed contractors to provide construction services for seawall replacements, stormwater improvements, mill and paving, maintenance of traffic (MOT), and striping along Sebastian Street and Seville Street west of Birch Road. Work includes construction of two new steel sheet pile walls, SWPPP implementation, vibration monitoring, drainage installations, curb removals, mill and resurfacing, and preparation of as-built surveys by a Florida-registered surveyor. The procurement is issued as an IFB with an estimated value range $5,000,000–$10,000,000 and a formal response deadline.
AvailableWork includes site work, materials, equipment, and labor necessary to repair failed sheet pile patches and fill existing voids behind the seawall of the mole pier. Sheet pile repair to include fabrication of steel repair panels, requiring underwater welding. Filling of voids to be accomplished using polyurethane foam grout injection. See engineered drawings. Environmental permits will be provided by the eor. In addition, the scope includes all materials and electrical work necessary for the installation of four (4) 50-amp dock pedestals, including conduit, wiring, terminations, ami meter, enclosure, disconnects, and coordination with utility connections as required to provide fully functional units. See outside link.
Posted Date
Aug 23, 2025
Due Date
Feb 18, 2026
Release: Aug 23, 2025
Close: Feb 18, 2026
Work includes site work, materials, equipment, and labor necessary to repair failed sheet pile patches and fill existing voids behind the seawall of the mole pier. Sheet pile repair to include fabrication of steel repair panels, requiring underwater welding. Filling of voids to be accomplished using polyurethane foam grout injection. See engineered drawings. Environmental permits will be provided by the eor. In addition, the scope includes all materials and electrical work necessary for the installation of four (4) 50-amp dock pedestals, including conduit, wiring, terminations, ami meter, enclosure, disconnects, and coordination with utility connections as required to provide fully functional units. See outside link.
AvailableWork includes 1 LS demolition & excavation; 150 ton sand fill & grading; 111 LF seawall; 1 LS concrete plug & chemical grout; 178 SF beach access stairs & landing; 107 SY concrete walkway; 160 LF aluminum guiderail; 158 plant dune plants - dune sunflower; 1,417 plant dune plants - sea oats; 156 plant dune plants - sea grape; 1 LS site restoration.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Work includes 1 LS demolition & excavation; 150 ton sand fill & grading; 111 LF seawall; 1 LS concrete plug & chemical grout; 178 SF beach access stairs & landing; 107 SY concrete walkway; 160 LF aluminum guiderail; 158 plant dune plants - dune sunflower; 1,417 plant dune plants - sea oats; 156 plant dune plants - sea grape; 1 LS site restoration.
AvailableProvide Brickell and Coconut Grove Seawall Improvements.
Posted Date
Dec 21, 2025
Due Date
Jan 30, 2026
Release: Dec 21, 2025
Close: Jan 30, 2026
Provide Brickell and Coconut Grove Seawall Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →