Retrieving RFP details
Release
Close
University Of Illinois At Urbana Champaign
Work includes to construct manure holding lagoons capable of holding an annual amount of 6.55 million gallons of manure from the production barns at the beef & sheep facility at the university.
BAU25035Advertisement
Marine Corps Installations West
Provide one 30 cubic yard dumpster used for the receipt of manure at the stables section aboard. The contractor shall place an empty dumpster upon removal of a full dumpster.
University Of Wisconsin Platteville
Purchase one new manure tanker. Specs include: New Balzer 2800 Vacuum tank, full 1/4 tank, 21.5x16.1 tires, LED road lights, 4 row disc spring injector, manifold and lift mechanism.
Inyo National Forest
Provide lagoon aeration. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. See outside link.
Release
Oct 28, 2025
Close
Dec 16, 2025