Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project scope shall include the expansion of an existing concrete common wall wastewater treatment plant by adding a second treatment train and all associated site and electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes wastewater treatment plant (0.35 MGD) and on-site lift station expansion.
Posted Date
Jan 16, 2026
Due Date
Feb 5, 2026
Release: Jan 16, 2026
Close: Feb 5, 2026
Work includes wastewater treatment plant (0.35 MGD) and on-site lift station expansion.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
AvailableWork consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
AvailableWork includes 64 SY 4 1/2" thick reinforced concrete sidewalk and mow strip, including sand base; 308 SY excavation for roadway and sidewalks, dispose of excess materials off site; 244 SY 7" concrete pavement including construction joints; 195 CY 8" stabilized subgrade; 85 LF sawcut and dowel into existing concrete pavement to ensure proper joint (match existing elevation per plans); 235 LF expand existing drainage swale including turf establishment and dispose spoils/excess materials off site; 875 LF provide and install reinforced filter fabric fence (includes removal and disposal after project completion). See attached files.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Work includes 64 SY 4 1/2" thick reinforced concrete sidewalk and mow strip, including sand base; 308 SY excavation for roadway and sidewalks, dispose of excess materials off site; 244 SY 7" concrete pavement including construction joints; 195 CY 8" stabilized subgrade; 85 LF sawcut and dowel into existing concrete pavement to ensure proper joint (match existing elevation per plans); 235 LF expand existing drainage swale including turf establishment and dispose spoils/excess materials off site; 875 LF provide and install reinforced filter fabric fence (includes removal and disposal after project completion). See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →