CityOH
Posted
Nov 4, 2026
Dec 2, 2026
Description: Construction to replace approximately 420 linear feet of 4-inch sewer lateral and 60 linear feet of 8-inch sewerline on Bay Avenue, including associated connections and surface restoration.
SpecialDistrict · CA, US
Decision makers connected to this RFP from Edgemont Community Services District.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
378 days before RFP
The Board meeting recorded that ECSD engineers were adding Bay Avenue cleanout and lateral replacement or repair work to the current ACO project before the City's sidewalk project.
Engineering Sam reviewed the ECSD Monthly Engineering Report -- District Projects of October 9, 2025. Sam reviewed the ECSD Monthly Engineering Report -- Development of October 9, 2025. He noted that the City of Moreno Valley is installing sidewalks on Bay Avenue between Day Street and Grant Street. As in the past, when the district knows of these projects…
Board of Directors of the Edgemont Community Services District Meeting of the Board of Directors
Board meeting · Oct 23, 2025
Board meeting
357 days before RFP
The Board authorized Albert A. Webb Associates to begin the design and construction process for the Phase 4A CIP Bay Avenue Sewer project.
Phase 4A CIP Project Bay Avenue Sewer -- authorize Webb to begin design and construction phase of the project -- Brenda moved to authorize Albert A. Webb Associates to begin the design and construction process for the Phase 4A CIP Project, Hillary seconded, motion carried.
Edgemont Community Services District Meeting of the Board of Directors
Board meeting · Nov 13, 2025
Board meeting
161 days before RFP
The Board approved a $12,000 increase to the Phase 4A CIP Bay Avenue Sewer design budget to add Bay Avenue laterals.
Phase 4A CIP Bay Avenue Sewer -- approve $12,000 increase in budget to add Bay Avenue laterals -- Sinnaro requested the board approve the increase in the design budget by $12,000. Brenda moved to approve the increase in design budget for this project, Cheryl seconded, motion carried.
Edgemont Community Services District Board Meeting Agenda
Board meeting · May 28, 2026
Meeting agenda
42 days before RFP
The agenda proposed Budget Amendment No. 2 for the Phase 4A CIP Bay Avenue Sewer project.
Board Meeting Agenda September 24, 2026 7:00 p.m. 1. Approve minutes of August 13, 2026 2. Public comment 3. Legal 4. Engineering a. District projects i. Phase 1 CIP Cottonwood Sewer -- approve Budget Amendment No. 2 ii. Phase 4A CIP Bay Ave Sewer -- approve Budget Amendment No. 2
Edgemont Community Services District Board Meeting Agenda
Meeting agenda · Sep 24, 2026
RFP published
Proposals due (16 days left)
Adjacent opportunities open for bidding right now.
CityOH
Posted
Nov 4, 2026
Dec 2, 2026
Work includes Temporary Sediment & Erosion Control; 4,400 LF of 12"FPVC C900 DR 18 Waterline (HDD); 425 LF of 8" Ductile Iron Waterline (Open Cut); 9 EA of 12" DIP Gate Valve; 16 EA Fire hydrant; 26 EA of 1" water service reconnection; 850 SY of Asphalt Roadway Pavement Replacement; 90 LF of Concrete Curb Removal & Replacement; 600 SF of Concrete Sidewalk Replacement.
Higher EducationLA
Posted
Nov 18, 2026
Dec 8, 2026
Louisiana State University (LSU) is soliciting replacement of filtration media (sand) and filter laterals for the UREC Leisure River and lap pool filtration systems, including removal and proper disposal of existing media and installation of new media and laterals. The scope defines NSF-certified #20 Mystic White (or equivalent) filtration sand and precise quantities and weights per pool (e.g., 308 bags / 15,400 lb; 246 bags / 12,300 lb; 124 bags / 6,200 lb) and specifies laterals fabricated from 1-1/2" SCH 80 PVC with machine-slotted openings and solvent-welded/thermo-welded connections. The supplier must perform testing, initial backwash and system startup, coordinate with UREC personnel, and complete all work within the mandatory shutdown window of December 24, 2026 through January 4, 2027.
CountyNY
Posted
Oct 29, 2026
Dec 1, 2026
Work include full replacement of the existing span wire signal with a new signal utilizing mast arms.
CityIL
Posted
Oct 2, 2026
Dec 1, 2026
Work includes construction of 8" and 6" water main installed by open cut construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; abandonment of existing water main; sanitary sewer removal and replacement; storm sewer removal and replacement; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main installation as shown, specified, or required.