Work includes 34 LF install 6' chainlink fence with barbed wire; 1 EA type 3 barricade, 6' double sided; 116 LF remove concrete curb and gutter; 2 EA remove drop inlet; 1 EA remove pipe end section; 58 LF remove storm sewer pipe; 146 SY remove asphalt concrete pavement; 2 SY remove concrete sidewalk; 227 LF saw existing asphalt; 54 LF saw existing pcc pavement; 4,831 CY unclassified excavation; 5,593 CY contractor furnished borrow; 863 CY placing topsoil; 110 ton aggregate base course; 50 ton asphalt concrete composite, pg 58-28; 3 sy 6" nonreinforced pcc pavement; 4 EA insert steel bar in pcc pavement no. 5. See outside link.