Jul 24, 2026
Closes
Aug 24, 2026
Quarry Road Resurfacing Project RFP
Work inlcudes road resurfacing.
Description: Access road grading project.
SpecialDistrict · CO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Jul 24, 2026
Closes
Aug 24, 2026
Work inlcudes road resurfacing.
CityCA
Aug 5, 2026
Closes
Sep 23, 2026
The City of Victorville is seeking bids for reconstruction and rehabilitation of approximately 97,000 square feet of roadway pavement along Readiness Road and adjacent areas at Southern California Logistics Airport. The work includes asphalt removal and replacement, subgrade and base preparation, conduit installation, curb and gutter replacement, utility structure adjustments, and ADA-compliant parking improvements, with prevailing-wage requirements. The project was released on August 5, 2026, requires a mandatory pre-proposal meeting on August 27, 2026, and bids are due September 23, 2026 at 2:00 p.m. Pacific Time.
CityME
Aug 4, 2026
Closes
Aug 25, 2026
Work includes 20 SY removing of concrete sidewalk; 345 SY removing bituminous concrete pavement; 60 SY removing pavement surface; 220 CY common excavation; 20 CY common excavation; 280 CY aggregate subbase course - gravel; 80 ton hot mix asphalt 9. 5 mm; 15 gal bituminous tack coat - applied; 2 EA adjusting manhole or catch basin to grade; 4 EA mailbox remove & reset; 50 LF remove and reset fence; 50 SY brick sidewalk (remove and rebuild); 48 SF curb ramp detectable warning field; ; 4,550 LF 4" white or yellow painted pave mrk line; 2 ea demount regulatory, warning, confirmation and route marker assembly sign. See attached file.
Aug 20, 2026
Closes
Sep 4, 2026
Roadway rehabilitation (grind and overlay) of village-owned and maintained streets. The work includes, but is not limited to, pavement surface removal, intermittent curb and gutter removal and replacement, sidewalk removal and replacement, full-depth pavement patching, intermittent driveway pavement removal and replacement, utility structure adjustments, placement of hot-mix asphalt (HMA) binder and surface courses, landscape restoration, pavement markings, traffic control and protection, and all incidental and collateral work necessary to complete the improvements in accordance with the plans and specifications. The total project length is approx., 5,102 LF (0.97 miles). The project also includes aggregate shoulder maintenance, intermittent pavement patching, and curb and gutter replacement.
Procurement and program contacts connected to Baseline Metropolitan District No. 1.