Closing soon

BAK - Air Traffic Control Tower Minimum Equipment List (MEL) Package RFP

Description: Project consists of providing the air traffic control equipment, slatwall style console system, furniture and fixtures (i.e.: supply cabinets, etc.) for the new Airport Traffic Control Tower (ATCT) facility at BAK. The new ATCT is a 9-level facility including the Control Cab. The work includes, but not be limited to, the supply, installation, testing, and commissioning of the new communications, weather, operations floor, non-operations and building equipment listed.

Buyer
Released
Aug 26, 2026
Closes
Dec 1, 2026(4 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts