CityOR
Posted
Aug 4, 2026
Oct 21, 2026
Electrical System Testing *REBID
Furnish a short-circuit protective device evaluation, coordination, and arc flash hazard analysis study for the electrical distribution system at the Willow Lake and River Road facilities. Scope of the studies shall include all existing electrical distribution equipment and systems at these facilities.
