Andover Unified School District 385
School DistrictKS
Posted
Nov 19, 2026
Dec 17, 2026
Parking Lot Maintenance RFP
Parking lot crack sealing, asphalt repairs, sealcoating, restriping, and curb repainting at Andover Public School District facilities.
Description: The State of Hawaii Department of Accounting and General Services, Automotive Management Division, seeks professional grounds maintenance and parking lot cleaning at the Kakuhihewa Building on Oahu. The contractor must provide all labor, equipment, tools, and materials and comply with applicable federal, state, and county requirements. Responses must be submitted through HIePRO, whose deadline is November 30, 2026 at 2:00 PM, although the attached bid document states December 4, 2026 at 9:00 AM HST.
State · HI, US
Adjacent opportunities open for bidding right now.
Andover Unified School District 385
School DistrictKS
Posted
Nov 19, 2026
Dec 17, 2026
Parking lot crack sealing, asphalt repairs, sealcoating, restriping, and curb repainting at Andover Public School District facilities.
New Jersey Department of Environmental Protection
State AgencyNJ
Posted
Nov 19, 2026
Jan 5, 2027
The solicitation is for an expansion of an existing parking lot. The lot serves a renovated facility used by the New Jersey Department of Environmental Protection Bureau of Marine Water Monitoring. The facility is shared with New Jersey State Park Police and NJDEP Marine Law Enforcement personnel.
CountyMO
Posted
Oct 30, 2026
Dec 8, 2026
Proposed work includes: Construction of new asphalt parking lot, curb & gutter, sidewalk, parking lot striping, and landscaping.
Environment and Climate Change Canada
State AgencyQC
Posted
Oct 15, 2026
Nov 27, 2026
SCOPE OF WORK Work to be completed under this contract involves the removal of existing asphalt paving, reprofiling the grading of designated areas shown in the drawings, upgrading some drainage infrastructure (curbs, manholes, among others), and installing a new asphalt surface. The replacement must be performed as per the drawings and specifications provided. The contractor must provide all the required materials, equipment before/during/after installation, and labour for installation, and manage the project requirements following the National Building Code of Canada. Project progress meetings are required at regular intervals with the owner, consultant, and the contractor; the specific intervals will be determined in more detail at the kick-off meeting. Further project details are contained in the project plans and specifications. This project shall be completed by March 31, 2027.
Decision makers connected to this RFP from State of Hawaii.
Solicitation files and supporting documents for this bid.