Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
138kv Disconnect Switch.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Edmond Public Works Authority seeks one 138kV horizontally mounted vertical break disconnect switch with a manual operator, constructed to NEMA/IEEE/ASTM/OSHA/NESC standards and delivered fully assembled to Garber Substation. The switch must meet specified electrical ratings (1200 A continuous current, 145 kV max, 650 kV BIL, 114 kA peak withstand) and include features such as arcing horns, semaphore position indication, and a galvanized steel base. Delivery is required on-site by September 1, 2026 and bidders must provide experience references, ISO-quality assurance evidence, and a Non-Collusion Affidavit.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Edmond Public Works Authority seeks one 138kV horizontally mounted vertical break disconnect switch with a manual operator, constructed to NEMA/IEEE/ASTM/OSHA/NESC standards and delivered fully assembled to Garber Substation. The switch must meet specified electrical ratings (1200 A continuous current, 145 kV max, 650 kV BIL, 114 kA peak withstand) and include features such as arcing horns, semaphore position indication, and a galvanized steel base. Delivery is required on-site by September 1, 2026 and bidders must provide experience references, ISO-quality assurance evidence, and a Non-Collusion Affidavit.
AvailableSwitch, disconnect, NSN 6110017189540, Qty 5.
Posted Date
Dec 28, 2025
Due Date
Jan 8, 2026
Release: Dec 28, 2025
Close: Jan 8, 2026
Switch, disconnect, NSN 6110017189540, Qty 5.
AvailableFurnish and deliver a new substation transformer and/or two 138kv substation breakers, and/or one 138kv circuit switcher with integral disconnect switch. The Project includes the following equipment: Bid Group A: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV to 13.8 kV, 30/40/50 MVA transformers. This shall include offloading, assembly, oil top off and testing of the transformer by the manufacturer. and/or Bid Group B: Furnish and deliver, including any necessary labor and materials needed to provide two new, 138 kV gas insulated breakers for use in the Substation. and/or Bid Group C: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV gas insulated circuit switcher with integral disconnect switch, mounting pedestal and anchor bolts.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Furnish and deliver a new substation transformer and/or two 138kv substation breakers, and/or one 138kv circuit switcher with integral disconnect switch. The Project includes the following equipment: Bid Group A: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV to 13.8 kV, 30/40/50 MVA transformers. This shall include offloading, assembly, oil top off and testing of the transformer by the manufacturer. and/or Bid Group B: Furnish and deliver, including any necessary labor and materials needed to provide two new, 138 kV gas insulated breakers for use in the Substation. and/or Bid Group C: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV gas insulated circuit switcher with integral disconnect switch, mounting pedestal and anchor bolts.
AvailableProject consists of prime data center 138kv site & building. See outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 2, 2026
Release: Dec 2, 2025
Close: Jan 2, 2026
Project consists of prime data center 138kv site & building. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →