Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Porum Public Works Authority
The City of Edmond Public Works Authority seeks one 138kV horizontally mounted vertical break disconnect switch with a manual operator, constructed to NEMA/IEEE/ASTM/OSHA/NESC standards and delivered fully assembled to Garber Substation. The switch must meet specified electrical ratings (1200 A continuous current, 145 kV max, 650 kV BIL, 114 kA peak withstand) and include features such as arcing horns, semaphore position indication, and a galvanized steel base. Delivery is required on-site by September 1, 2026 and bidders must provide experience references, ISO-quality assurance evidence, and a Non-Collusion Affidavit.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Porum Public Works Authority
Close: Jan 6, 2026
The City of Edmond Public Works Authority seeks one 138kV horizontally mounted vertical break disconnect switch with a manual operator, constructed to NEMA/IEEE/ASTM/OSHA/NESC standards and delivered fully assembled to Garber Substation. The switch must meet specified electrical ratings (1200 A continuous current, 145 kV max, 650 kV BIL, 114 kA peak withstand) and include features such as arcing horns, semaphore position indication, and a galvanized steel base. Delivery is required on-site by September 1, 2026 and bidders must provide experience references, ISO-quality assurance evidence, and a Non-Collusion Affidavit.
Porum Public Works Authority
Provide and construct a 155 GPM complete water booster pump station and provide a portable generator.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Porum Public Works Authority
Close: Dec 16, 2025
Provide and construct a 155 GPM complete water booster pump station and provide a portable generator.
Porum Public Works Authority
Construction of: Remove and replace approx. 892 LF 10" sewer line, 400 LF 15" sewer line, 3 manholes, 12 service connections, and 65 LF surface repair.
Posted Date
Aug 28, 2025
Due Date
Sep 18, 2025
Release: Aug 28, 2025
Porum Public Works Authority
Close: Sep 18, 2025
Construction of: Remove and replace approx. 892 LF 10" sewer line, 400 LF 15" sewer line, 3 manholes, 12 service connections, and 65 LF surface repair.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Porum Public Works Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database